1m 2m 3m Ladekabel langes Blei USB für Samsung Galaxy Z Flip 5 4-fach 5 4 3 5G
ab 4,46 €
Available Length: 10CM, 1M, 2M, 3M. Samsung Galaxy A9 A8+ 2018 A3 A5 A6s A7 2017. Samsung Galaxy Note9 Note8 Note7 Note FE. Samsung Galaxy S9 S8 Plus Lite / S Light Luxury. Samsung Galaxy A20e A30 A40 A50 A60 A70.
Jetzt bei Ebay:
-
Item Length:1Meter
-
Colour.:White (Non Braided)
-
Items Included:Charging Cable
-
American Wire Gauge (AWG):24C + 28D
-
Colour:Black
-
Function:Fast Charging , Sync Transfer
-
Unit Type:Unit
-
Number of Ports:1
-
Version:3.1
-
Core Material:Pure Copper Conductor
-
Manufacturer Warranty:1 Year
-
Quality:High Quality
-
Output:3.6-12V, Up To 3.0A
-
Item Height:1m, 2m, 3m
-
Features:Fast Charge, Heavy Duty, Lightweight, Extra Long, Extra Strong
-
Cable Length:1 m, 2 m, 3 m, 10 cm
-
Unit Quantity:unit
-
Item Width:/
-
Connector(s) B:Type C USB Cable Male
-
Compatible Brand:Universal, For Amazon, For Apple, For Google, For Honor, For Huawei, For OnePlus, For Samsung
-
Speed:Upto 480Mbps
-
Cable Length (metres):10CM, 1 Metre, 2 Metre, 3 Meter
-
Use:USB Sync Braided Cable Data cable for Latest Type C Devices
-
Characteristic:2.8A Fast Charging Charger
-
Compatible Model:For Google Pixel 6 Pro, For Google Pixel 7 Pro, For Google Pixel 8, For Google Pixel 8 Pro, For Huawei Mate 20 Pro, For Huawei P30 Pro, For Samsung Galaxy A9 A8 2018 A3 A5 A6s A7 2017, For Samsung Galaxy Note20, For Samsung Galaxy Note20 5G, For Samsung Galaxy Note20 Ultra, For Samsung Galaxy Note20 Ultra 5G, For Samsung Galaxy S22, For Samsung Galaxy S22 Ultra, For Samsung Galaxy S22+, For Samsung Galaxy S24, For Samsung Galaxy S24 Plus, For Samsung Galaxy S24 Ultra, For Samsung Galaxy S24+, For Samsung Galaxy S9 S8 Plus Lite / S Light Luxury, For Samsung Galaxy Z Flip3 5G, For Samsung Galaxy Z Flip4, For Samsung Galaxy Z Fold3 5G, For Samsung Galaxy Z Fold4, For Samsung Galaxy s23, For Samsung Galaxy z, For Samsung Galaxy z Flip5, For Samsung Galaxy z Fold5
-
Material:Nylon
-
Weight:0.21g
-
Brand:Speedy
-
Type:Charging & Data Sync Cable
-
Design/Finish:Braided
-
Connectivity:USB-C
-
Connector A:USB 2.0 Male
-
Wire Core:28 AWG(Data) + 24 AWG(Power)
-
Country/Region of Manufacture:United Kingdom
-
Item Weight:50g
-
Personalise:No
-
Expressversand:eBay Delivery Packlink International 28,69 EUR - Lieferung zwischen 13. November 2024 und 19. November 2024 (bei heutigem Zahlungseingang)
-
None:Royal Mail International Tracked 21,50 EUR - Lieferung zwischen 13. November 2024 und 22. November 2024 (bei heutigem Zahlungseingang)
-
Economy Shipping from outside:SpeedPAK Economy 14,35 EUR - Lieferung zwischen 06. December 2024 und 08. January 2025 (bei heutigem Zahlungseingang)
-
Versand nach:Europa, Albanien, Andorra, Österreich, Belarus, Belgien, Bosnien und Herzegowina, Bulgarien, Republik Kroatien, Zypern, Tschechische Republik, Dänemark, Estland, Finnland, Frankreich, Deutschland, Gibraltar, Griechenland, Guernsey, Ungarn, Island, Irland, Italien, Jersey, Lettland, Liechtenstein, Litauen, Luxemburg, Mazedonien, Malta, Moldawien, Monaco, Montenegro, Niederlande, Norwegen, Polen, Portugal, Rumänien, San Marino, Serbien, Slowakei, Slowenien, Spanien, Svalbard und Jan Mayen, Schweden, Schweiz, Vatikan
-
Versand ausgeschlossen:Afghanistan , Libyen , Nauru , Somalia , Jemen , Ukraine , Russische Föderation