Die Inhalte dieser Webseite enthalten Affiliate-Links, für die wir möglicherweise eine Vergütung erhalten.
  • Bild 1
  • Bild 2
  • Bild 3
  • Bild 4

Tragbares Power 1800RC 12 V Sprungstarter/Booster Pack - Long Lead Pack (1,5 m)

469,28 €

Portable Power are a UK company that have been manufacturing their industry leading packs in Yorkshire for over 25 years. Until 2018, they were sold under license exclusively through Snap-On franchises (as the PORPR1700). That agreement has now ended and we are able to supply them direct from the manufacturer with the same great quality, a comprehensive 2-year warranty and full manufacturer backed service and support. r107 Parts Ltd is a VAT Registered UK company specialising in the supply of professional quality tools to the automotive industry. The Ultimate 12v Jump Starter The design of the original Portable Power 1000, was so good that it's never been changed but that's not to say that the pack used by over 50% of the UK's professional mechanics* isn't still at the top of it's game.

Jetzt bei Ebay: